We offer numerous surface finishes including shot blasting, epoxy primers, paint, intumescent fire protection and galvanising. In terms of fire protection, we can achieve fire resistance requirements from 30 to 120 minutes.
Our team of steel erectors are fully trained in handling all aspects of erection safely, on-time and within budget. We carry out rigorous on-site quality checks on erected assemblies and their connections. Furthermore, we undertake the installation of all cladding, roofing and rainwater systems.